Any attempt to stop the settlement without making the proposed preliminary investigation would be an irresponsible gamble. Since I have witnessed many gambles of this kind I can state from personal experience that the savings associate with inadequate preliminary investigations are entirely out of proportion to the financial risks.”
  Karl Terzagi
About the Journal   ISEG Council 2020-2021    Editorial    GUIDELINES FOR AUTHORS    TITLE PAGE
Paper Contents Page No. 
Paper 1 I-System: Index of Ground-Structure (2021 Edition)
Bineshian, H
01
Paper 2 Ground Characterisation for Design using I-System Software : Case Studies
Bineshian, H

51
Paper 3 Behaviour of cohesion and angle of friction on variant rock mass foundation for the design of underground dam in Chasnalla colliery, Jharkhand, India.Chronology of Development of I-System: A Brief History
Bineshian, H.
73
Paper 4 Long range underground prediction of ground behaviour/hazards at tunnel T13 in USBRL project using TSP
Choudhary, K., Bineshian, H., Dickmann, T., Gupta, S and Hegde, R.K.
78
Paper 5 Earthquake scenario selection of Tindharia landslide in India
Neharika, G.N.S and Neelima Satyam, D.
91
Paper 6 Pull-out test of rock bolts: Analyzing the causes of failure
Sahoo, R. N., Singh, Ajay and Dash, A. K.
106
Paper 7 Role of geotechnical monitoring instrumentation in Tehri Pumped Storage Plant (1000 MW) – A case study
Prasad, Rajeev, Shukla, Atul Kumar and Kumar, Tarun
118
I-System Software
I-System Software
134
EGCON-2021: Virtual Conference
EGCON-2021: Virtual Conference