|
About the Journal Title Page Editorial |
PAPER |
CONTENTS |
Page No. |
Paper 1 |
Influences of geo-mining conditions on strata control studies during underground pillar extraction: Some Indian experiences
Singh, Arun Kumar , Mandal, Prabhat Kumar , Ram, Sahendra , Singh, Amit Kumar , Kumar , Rakesh and Singh, Rajendra |
9 |
Paper 2 |
Tunnelling through weak and water charged strata by Ground Improvement- A case from Maneri Bali HE Project, Stage-II, Uttarakhand
Gajbhiye, P. K. and Bhattacharjee, N. R. |
25 |
Paper 3 |
Importance of systematic geotechnical investigations for underground structures in engineering projects.
Mishra, Prasanta, Ghoshal, T.B. and Raju, M. |
33 |
Paper 4 |
Tunneling through phyllitic rocks - A case study of 12 km long water conducting tunnels of Dewas-II project, Udaipur, Rajasthan, India
Sharma, V.P. |
44 |
Paper 5 |
Impact on air environment due to underground space construction
Renaldy, T. Amrith and Roy, Surendra |
55 |
Paper 6 |
Investigation and analysis of strata control problems in continuous miner workings
Lokhande, R. D., Venkateswarlu, V., Varma, A.L.S.V., Srinivas, C.H. and Veeraswamy, H. |
75 |
Paper 7 |
Combating Rock burst in underground excavations
Srinivasan, C. and Willy, Y.A. |
84 |
Paper 8 |
Instrumentation– A key to stability analysis of large caverns in hydroelectric projects
Nair, Sripad R., Sudhakar, K. and Nair, Roshan |
103 |
Paper 9 |
Strata control problems of underground coal mining Vis-À-Vis
geotechnical instrumentation and numerical model studies
Jayanthu, S. |
117 |
Paper 10 |
Room-and-Pillar design practices of Illinois coal (No 5) Seam
Mishra, M.K., Singh, V.K. and Chugh, Y.P. |
134 |
Paper 11 |
Speedy development of hydro power project in Sikkim Himalaya
by optimization of head race tunnel layout- A case study of Teesta -V H E Project ( 510MW), East Sikkim
Mathur, N. K. |
143 |
Paper 12 |
Application of RS and GIS in prediction of the debris flow
Rui. Huang, Jian-ping. Chen, Hui-zhong Li and Jin-sheng Que |
154 |
Paper 13 |
Excavation of 17Km long head race tunnel for 1000 MW Karcham
Wangtoo hydroelectric project in NW Himalaya
Sati, K.K., Sood, K.K., Singh, Praveen and Goyal, D. P. |
165 |
Paper 14 |
Guidelines for selection of tunnels and tunneling methods
Kumar, Rakesh, Vasudevan C., Sharma, G.S. and Lalitha O.R. |
177 |
Paper 15 |
Advance ground improvement technology for tunneling in low cover
Mal Barna, B.D. |
188 |
Paper 16 |
Longwall barrier design: A perspective
Nair, Roshan and Sastry V.R. |
194 |
Paper 17 |
Rockmass characterization at Saptkosi multipurpose high dam
project In Nepal
Bahuguna, Harish, Sanwal, Rajendra and Ghoshal, T. B. |
205 |
Paper 18 |
Role of geological structures on pot-hole subsidence development due to underground mining
Lokhande, R. D., Murthy, V.M.S.R. and Singh, K. B. |
223 |
Paper 19 |
Pre-grouting in the HRT of Teesta III hydroelectric power project, North Sikkim, India
Singh, A.K., Singh, K.K., Vashisht, N.K. and Boruah, P. |
239 |
Paper 20 |
Conclusions on the management of road tunnels after six years of application of the directive 2004/54 of the EC
Pablo Jarillo López, Javier Ángel Ramírez, David Fernández-Ordoñez and Carlos Delgado Alonso-Martirena |
249 |
Paper 21 |
Analysis of earth temperature field and geothermal hazard
evaluation at Gaoligong mountain tunnel
Jihong Qi and Mo Xu |
255 |
Paper 22 |
Preliminary study on risk assessment of tunnel gas disaster
Kang Xiao-bing and Xu Mo |
266 |
Paper 23 |
Power house cavern stability monitoring using microseismics at
Tala hydro power project, Bhutan
Sivakumar C., Srinivasan C., Willy. Y.A and Nawani P.C. |
273 |
Paper 24 |
Mechanized tunneling in Himalayas: Risk assessment and
management of geological challenges
Dhawan, Gopal and Bhatnagar, Sharad |
283 |
Paper 25 |
Engineering geology at the cross roads
Dhawan, Gopal and Sayeed, Imran |
294 |
Paper 26 |
Influences of Geo-Mining conditions on strata control studies during underground pillar extraction: Some Indian experiences
Raju, B.Veera , Karunakar, M., Sharma, D. N. and Rama Rao, K.V.Seeta |
309 |
Paper 27 |
Engineering geology of failed sections of four flexible pavements in southwestern Nigeria
Khan, Sharique and Khullar, Aman |
320 |
Paper 28 |
Strength and deformability characteristics of pyroclastic rock mass
Dev, Hari , Singh, Rajbal and Yachu, J.K. |
328 |
|
|