Any attempt to stop the settlement without making the proposed preliminary investigation would be an irresponsible gamble. Since I have witnessed many gambles of this kind I can state from personal experience that the savings associate with inadequate preliminary investigations are entirely out of proportion to the financial risks.”
  Karl Terzagi
About the Journal   ISEG Council 2020-2021    Editorial    GUIDELINES FOR AUTHORS    TITLE PAGE
Paper Contents Page No. 
Paper 1 Challenges in development of river valley and hydel projects in karst terrains - Broad issues
Singh, Yamuna
1
Paper 2 Applications and future of ground penetrating radar (GPR) as a near-surface geophysical technique: A review
Sinharay, Rajib K.

12
Paper 3 Excavation of silt flushing tunnel (SFT) in difficult geological conditions-A case study
Thakur, S.N., Prakesh .V and Pargaien, C.G
18
Paper 4 Geological and geotechnical challenges faced during construction of Rohtang highway tunnel - A case study
Pathak, Mridupam and Saini, Sandeep Kumar
24
Paper 5 Importance of geotechnical instrumentation for tunnel & cavern projects
Tomar, Narendra Kumar Singh
40
Paper 6 Challenges in rock slope stability analysis – A case study
Raj, A., Khan, S., Pathak, L. and Khullar, A.
50
Paper 7 Technological advancements in topographical survey- Utility of Digital Elevation Models and GIS
Kapil, S.L., Nagar, Vipul and Shweta
55
Paper 8 Petrographic evaluation of natural aggregates as construction material from Bhogavo rivers, Surendranagar district, Gujarat
Srivastava, Sanjay and Rathod, Benal
62
Paper 9 I-System: Index of ground-structure
A comprehensive indexing system for ground-structure behaviour classification and characterization
Bineshian, H.
73
Paper 10 Cut-off wall- a boon for deep dam foundation pits: A case study of Mangdechhu hydro-electric project, Bhutan
Mishra, A. K., Chaudhary, R.K., Punetha, P., Ahmed, I.
110