|
PAPER |
CONTENTS |
Page No. |
Paper 1 |
Importance of Seismic Aspects of Underground Structures in
Hydro Power Projects in Himalayas
- Raman, R. and Kapoor, J.S. |
1 |
Paper 2 |
Shear Strength of Rock Mass - Interpretation and Analysis
-Hari Dev
|
11 |
Paper 3 |
Grout intake estimate for underground works
-Kannan, G.,Pal, S.,Nanda, A.and Rath, R. |
19 |
Paper 4 |
Slope stability assessment of Tambakhani Chute, part of
Varunavat landslide, Uttarakashi, Uttarakhand, India
-Kumar, Dharmendra, Mishra, Asit K, Kundu, Vinay and Gairola, B.M. |
28 |
Paper 5 |
Slope stability assessment of Hathi Parvat landslide along
Badrinath route on National highway-58
- Kundu, Vinay, Kumar, Dharmendra and Singh, Bhupendra |
33 |
Paper 6 |
Engineering geology for high dams
-Bhardwaj, Sunil and Thakur, Vinod |
39 |
Paper 7 |
Seismic analysis & design of surface power house,
Rampur H.E. Project (412 MW)
- Verma, L.M., Abrol, R.K. and Chauhan, Manish |
51 |
Paper 8 |
Interpretation of deformability of rock mass at dam site of
Nyera Amari hydropower project in Bhutan
-Singh, Rajbal and Garg, Sanjeev Kumar |
64 |
Paper 9 |
Site specific seismicity assessment of a port in India
- Badrakia, Pranav M., Gandage, Abhijeet S.and Joshi, Rahu |
78 |
Paper 10 |
Evaluation of geological properties of rock mass of Loktak
downstream dam site with emphasis on its groutability
- Ghosh Roy, M.and Sayeed, Imran |
95 |
Paper 11 |
Laboratory assessment of rock- a case study
- Singh, Sukhdev, Murthy, P.S.K and Gupta, S. L. |
112 |
Paper 12 |
Investigation of critical landslides and design of remedial
measures on national highway-5, Himachal Pradesh
-Prasad, P.S.and Kumar, Kishor |
118 |
Paper 13 |
Groundwater assessment and its health impacts for Rajghat
dam reservoir, Sagar district, Madhya Pradesh, India
- Chourasia, Abhilasha and Rawat, R.K. |
133 |
Paper 14 |
Application of analytical hierarchy process in decision support
software for control measure (DSSCM) to mitigate landslide
risk
- Chaturvedi, P., Srivastava, S.and Bhutiyani, M.R. |
147 |
Paper 15 |
Interventions for highly permeable tunnel parallel joints in
underground storage caverns
- Pal, Saikat, Kannan,Gopi, Rath, Ranjit and Nanda, Atul |
155 |
Paper 16 |
Instrumentation in concrete gravity dam with special reference
to Nathpa Dam of SJVN Ltd
- Chadha, A.K.and Gupta, B.K. |
164 |
Paper 17 |
Successful initial filling of 15 km long 10.50 m dia. head race
tunnel of Rampur hydroelectric project (412 mw) constructed
in Himalayan Geology risks and challenges
- Varma, L.and Sehgal, R. |
177 |
Paper 18 |
Macro scale (1:50,000) landslide susceptibility mapping in
parts of Kullu and Mandi districts, Himachal Pradesh
-Lakshmanan. K., Mandal, Jina , Jayabalan. K.and Kumar, Manoj |
192 |
Paper 19 |
Geotechnical problems encountered during the excavation of
rock ledge for EOT Crane in underground Power house of
Shongtong-Karchham Hydro Electric Project-450MW- A case
study
- Negi, Virender Singh, Rohela, P.K.S., Rana, Anit Singh and Chaubey,
Ravi. S |
210 |
Paper 20 |
Macro scale (1:50,000) landslide susceptibility mapping in
parts of Kullu, Mandi, Chamba, Kangra and Lahaul & Spiti
districts, Himachal Pradesh
- Rangari, Kundan Digambar, Chaubey, Ravi Shankar, Kumar,
Manoj, Jayabalan, K., |
224 |
Paper 21 |
Geo-Engineering solutions for stabilization of cut slopes in
the Surface Power House area of Luhri Hydroelectric Project
Stage-I -
Gupta, Sanjeev, Sharma, Mukesh Kumar, Kaushal, Aashish |
234 |
Paper 22 |
Geotechnical assessment regarding feasibility of proposed
additional spillway site, Hirakud dam project, Sambalpur
district, Odisha
-Sahoo, Debaprasad, Munda, Ramesh Chandra, Mukherjee, Jaydip and
Joshi, Kaumudi |
241 |
Paper 23 |
Assessment of the rock mass of escape tunnel –a case study
from lift irrigation project, Telangana State, India
- Rawat, D. S., Naithani, A. K., Singh, L.G., Jain, P. and Patel, R.,
Babu, R.N.S. and Rao, G. S. |
255 |
Paper 24 |
Geological investigation on the causes of collapse of
irrigation tunnel -a case study from Hulikere, Mandya district,
Karnataka
-Ganesha, A.V., Prakash Narasimha, K.N.and Kumar, L. Prasanna |
265 |
Paper 25 |
Role of geotechnical instrumentation in construction stage of
Hydroproject – acase study (Rampur HPS 412 MW)
-Chadha, A.K., Dutt, Mahesh, Kumar, Ajay, Devi, Sudha and Badoni,
Brijesh |
275 |
Paper 26 |
Different techniques adopted to tackle the geological
adversities during the construction of Rampur hydro power
station (412 MW) –A case study of head race tunnel
-Chadha, A.K., Dutt, Mahesh, Sharma, Uma Kant and Kumar, Ajay |
284 |
Paper 27 |
Geologically problematic band and its treatment on upstream
wall of large underground surge pool cavern-A case study from
lift irrigation scheme-Telangana State, India
-Babu, R. N. S., Nath, R. K., Rawat, D. S., Naithani, A. K.,and Rao, G. S. |
296 |
Paper 28 |
Assessment of physico-chemical parameters of groundwater
quality in Ramanagaram taluk, Karnataka
-Ganesha, A.V.,Krishnaiah, C.,Krishnegowda and Suresh, S. |
308 |
Paper 29 |
Prognosis and treatment of buried channels in river valley
projects – A geotechnical perspective
-Chakraborty, Arindom, Sharma, Vivek and Rath, Shishir |
317 |
|
|